Reduce Production Costs

Reduce Design Verification Time and Expense

Design verification can be the lengthiest and one of the most costly processes in getting a new product to market. ESPEC HALT and HASS chamber systems accelerate the process by applying stress extremes to expose as many failures as possible. In 3 to 5 days, design engineers can observe many more failures than found with Design Verification Testing (DVT), but which would most likely show up in the field. Finding and fixing these flaws before going into final verification testing reduce the number of DVT cycles and will help get new product out the door fast.

Remove Costly Manufacturing Defects

ESPEC HALT and HASS chamber systems safeguard design integrity by detecting flaws introduced during the manufacturing process or from inferior parts substitutions by upstream suppliers. Implement accelerated stress testing to verify integrity of process, especially when dependent on remote contract manufacturers to deliver established quality goals.